work handling case study two Components/assemblies that are intricate, delicate and/or expensive where a general pocket is deemed unsuitable, customised containers would be the answer. Our Technical department working from your CAD drawings, Engineering drawings or actual components will find the answer to ensuring your “Total Component Protection”, in house, to and from subcontract, through to storage and final despatch.Contact us to arrange for an Engineering site visit to see if we can assist and reduce your manufacturing costs using environmental friendly material.
|